Practical Solutions for Wildlife and Ecology

Arbroath Flood Prevention Scheme

Client:
Galiford Try 

Duration:
1 day each week April 2021 to June 2022 

Responsibilities include: 

  • Water pollution monitoring and pollution mitigation supervision.
  • Testing and chemical analysis of water samples.
  • Protected species surveys.
  • Translocation of reptiles and amphibians.
  • Breeding bird and nesting bird surveys and protection mitigation measures.
Arbroath Flood Prevention works
Arbroath Flood Prevention works
ssepng enecologopng baywarepng EDF engergy logo Morrisons Construction logo Scottish Water logo innogypnggreenhighlandpng glendevonenergypng naturalresearchpng