Client:
BayWa Ltd (based in Munich)
20MW wind farm with 8 turbines
Duration:
November 2011 thru to November 2013 (2-3 days each week)
Responsibilities include:
- Construction site monitoring.
- Water pollution monitoring and pollution mitigation supervision.
- Testing and chemical analysis of water samples.
- Protected species surveys.
- Translocation of reptiles and amphibians.
- Breeding bird and nesting bird surveys and protection mitigation measures.
- Development and implementation of Annual Monitoring of Site following construction.
- Woodland management associated with wind farm.